Check out this hand rail Jamie hand made from a tree on the land.
Loft railings start to go up.
Another view of the loft area railings.
Here's a view from the second floor loft looking out the front.
Another view of the front end overlooking the mountains.
View front the right front side.
The dormer siding is on and the porch for the main entry is going up.
The front windows and double entry doors finally go in.
Here's the main fireplace custom built to the home owners specs.
Notice the built in wood box on the right.
Here's another view of the main fireplace.
There's going to be pizza oven on the left top with room for the dehydrator on the bottom.
Here's a shot of one of the main support post.
This is a real log, not simulated material.
Here's Jamie applying the half log siding to the front dormer.
The ridge beam is in and the roof rafters are finally starting to go in.
If you look closely, you can see the tempory staircase inside.
Part of the rear wall goes up.
This wall was lifted into place by man power, no crane.
Here's another angle of the same rear gable end being set in place.
Here's a full view of the rear gable end being set in place by the crane.
Here's a view of the rear gable end wall going up from what will become the front entrance.
thats Tim under the 2nd floor beam and I-joist.
View of the right front end.
View of the left front end.
That's Jamie of the top of the wall.
View of the open front end.
That's Jamie and his friend Brown on top of the wall.
Another view of the right rear corner a few rows higher.
Here's the first few rows of the right rear corner.
Here's a view of a few window buck frames going in after 4 rows of logs.