This is your typical open cellar before any construction started.
Again, a basic open cellar with a partial plywood wall for the utility panel.
This will become the new kitchen area.
Look for how the electrical panel gets hidden in the kitchen.
My son, Ken, digging the holes for the new sewage pump to be installed underground.
This a the main drain line we ran for the 2 bathrooms to be located in the cellar.
All walls get framed in and also included access panels for pipe cleanouts.
The playroom gets a knee wall with a shelf on top.
All exterior walls get framed in.
All exterior walls get fiberglass insulation with a vapor barrior.
More insulation for the play room area.
Located behind the bathroom and in the utility area, is the underground pump up sewage tank.
Here's the kitchen without the counter tops.
Can you see where the electrical panel is located ?
Finished Living room has a double door into the playroom.
Living room with the doors to the playroom open.
This is to be the play room area.
Another view from the playroom towards the cellar stairs.
The bedroom has a double door walk in closet the full lenght of the room.
The bath room has a corner shower unit.